Mixing type flotation machine why cannot leave a triangle?
Home » News » ai article » Mixing type flotation machine why cannot leave a triangle?

Mixing type flotation machine why cannot leave a triangle?

Views: 0     Author: Uliflex     Publish Time: 2020-12-01      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Mixing type flotation machine installation and debugging and routine maintenance: 1, the installation order: first head tub installed, then install intermediate tub, zui tail tub after installation. (2) the tub before installation to use level of surveying and mapping instrument to measure the level of the base seat, tub after loaded on the basis, make the tub on either side of the overflow weir into the same level, with level alignment between the different tub, with different thickness of the plate making level of the whole machine on the length direction and width direction are consistent, total deviation on the length direction should not exceed 3 - 5 mm, into the mouth, tub and tub, tub with my company box connections shall not have leakage phenomenon, then tighten the various parts of the body bolts 2 type flotation machine, the stirring mechanism (1) hollow shaft and impeller should be installed, impeller water level should be confirmed with hollow shaft, vertical and not string move up and down. (2) the impeller should be with the false bottom center hole of the triangle, the deviation is not more than 3 mm. (3) of the stator vane and the steady flow on the false bottom plate alignment, shall not be staggered. (4) between the impeller and the stator of the radial, axial clearance should be confirmed in the 7 - 9 mm, between installation can be in office from the impeller diameter in equidistance three measuring the clearance, axial clearance adjustment by adjusting pad. (5) the installation of triangle elastic should be moderate, v-belts, first install the motor and the size of the stirring shaft pulley, right triangle to be included in the pulley groove again after leveling, adjusting the center distance, tensioning v-belts. Continue to adjust rotating motor v-belts, make loose edge when loading drive a little bow. 6. Install the triangle wheel safety cover, safety shield leg inserted into the pipe should be solid. 7) check the motor rotation direction, the impeller to rotate clockwise, mixing mechanism should be flexible rotation, no jam phenomenon. Impact henan hongxing machinery factory production of the series, mobile crusher, crushing equipment, mining crushing machinery industry development in our country has played a pivotal role. 3, stirring type flotation machine scraper mechanism (1) install scraper shaft, scraper, scraper, rubber, and make the scraper shaft rotation, scraper rubber sheet is consistent with the gap between the overflow mouth, is not greater than 5 mm, after a tank scraper with previous scraper 30 ° staggered in turn. (2) the center of the scraper shaft are on the same straight line, the alignment between two axis deviation is not greater than zero. 8mm。 This article by triangle synchronous belt wheel original, reproduced please indicate the copyright: http://www. lilainuo。 com

Related News

Copyright © 2021 Foshan Uliflex Transmission Technology Co,. LTD. Technology by LeadongSitemap.